Our projects
UC Merced 2020

The Pavilion opened in Aug. 2018.The Pavilion opened in Aug. 2018.
Like Glacier Point, Granite Pass Student Housing includes 10 classrooms and additional space for students to study.Like Glacier Point, Granite Pass Student Housing includes 10 classrooms and additional space for students to study.
The Pavilion opened in Aug. 2018. The 600-seat dining facility includes three dining rooms.The Pavilion opened in Aug. 2018. The 600-seat dining facility includes three dining rooms.
Custom stained poplar used for the walls and ceiling is featured in the Performing Arts Center inside Building 2B.Custom stained poplar used for the walls and ceiling is featured in the Performing Arts Center inside Building 2B.
Building 2B also houses the Computational Lab and Faculty Offices.Building 2B also houses the Computational Lab and Faculty Offices.
In 2018, NWD completed work on both the Housing and Classroom buildings (1B and 1A/3B) in addition to the Dining Pavilion (1D).In 2018, NWD completed work on both the Housing and Classroom buildings (1B and 1A/3B) in addition to the Dining Pavilion (1D).
Here is some of the casework Northwestern Design is installing for the second phase of the project.Here is some of the casework Northwestern Design is installing for the second phase of the project.
Project Details
The three-phase expansion project at the University of California, Merced is complete. UC Merced 2020 broke ground in 2016.
The expansion added 13 new buildings to the campus, founded in 2005. These buildings house classrooms, laboratories, offices, student housing, life facilities and recreational areas. The 1.2 million gross-square-foot project doubled the campus size. But more importantly, the project offered the necessary facilities to accommodate enrollment growth.
NWD provided the casework for the first phase of the project. This included buildings 1A/3B and 1B (Housing and Classrooms) and 1D (Dining). The initial phase featured 20 classrooms and 729 beds of student housing in the Glacier Point and Granite Pass buildings, as well as a 600-seat dining area.
In addition, Northwestern Design also delivered the casework and millwork for 2B (Computational Lab and Faculty Offices), 3A (Wet Laboratory), 3C and 3D (Housing and Student Life), 3G (Conference Center) and 3H (Enrollment Center).
General Contractor – Webcor Builders
Architect – Multiple
See the Work. Understand the Difference.
Learn how our services reflect the level of craftsmanship, coordination, and execution we bring to every job. See these results in our completed projects.
Featured Projects
We bring together craftsmanship, technical execution, and coordination across a variety of projects.
Baker Tilly (Moss Adams)
San Joaquin County Morgue/Medical Examiner’s Office